New developments in the canton of Zurich
37 residential developments on the market.
Get the new projects matching this search
Each morning, an e-mail with the new projects that match. No account needed, unsubscribe in one click.
Coming soonZHErsatzneubau Kornhaus-/Rötelstrasse
Zürich, Zurich
Online since September 2024 · checked 3 days ago
96 homes
Replacement of the 1920s colony of the Dr. Stephan Porta Foundation in Zurich-Unterstrass with a new complex of 96 rental apartments and two studios. Construction began at the end of September 2024 and move-in is planned for autumn 2027. Registrations are not yet possible; the link will be opened by April 2027 at the latest.
Coming soonZHVeduta II
Winterthur, Zurich
Online since September 2024 · checked 2 days ago
5 homes
Veduta II is a project of five apartments in the form of a terraced house, located at Kurlistrasse 17 in Winterthur, in a green, quiet neighbourhood with a view over Oberwinterthur. The staggered terraces, gardens and light wells offer a great deal of privacy and brightness. An underground car park with direct lift access ensures accessibility for everyone.
Coming soonZHBüelgass
Gossau, Zurich
Online since May 2024 · checked today
57 homes
A group of sustainable buildings comprising around 57 rental apartments as well as service and retail spaces is to be built in the centre of Gossau, around the existing Büelgass housing estate. The project, resulting from a competition won by Squadrat, provides for three pairs of buildings, a car-free environment, a public pavilion and renaturation along the Laufenbach. The building permit is expected in spring 2027, and move-in could take place in 2030.
Coming soonZHTorfmatt
Brüttisellen, Zurich
Online since March 2024 · checked 3 days ago
300 homes
The Torfmatt neighbourhood will be built on the former ERNI site in Brüttisellen, between the village centre and Dietlikon railway station. It will comprise around 300 homes and studio-residences, as well as commercial, office, retail spaces and a small restaurant, around eight buildings and an inner courtyard. The development plan was approved in March 2026, construction is scheduled to begin in 2028 and completion in 2031.
Coming soonZHGartenstadt Köschenrüti
Zürich, Zurich
Online since March 2024 · checked yesterday
300 homes
Replacement of buildings from the 1950s in need of renovation, in the Seebach district of Zurich, with nine terraced buildings comprising approximately 300 dwellings. The project reinterprets the garden-city character with generous green spaces, in two construction phases. The first dwellings are expected to be ready for occupancy around 2029.
Coming soonZHDorfplatz 13
Zumikon, Zurich
Online since April 2023 · checked 2 days ago
35 homes
The Dorfplatz 13 project in Zumikon replaces the former Schweizer butcher's shop and integrates into the new village square. It will house a village restaurant with terrace as well as approximately 35 rental apartments of 2.5, 3.5 and 4.5 rooms, spread across two buildings, including maisonettes with private gardens. The building permit application was submitted in summer 2026, and completion is targeted for 2029.
Coming soonZHGartenstadt Bergacker
Zürich (Affoltern), Zurich
Online since February 2023 · checked 4 days ago
270 homes
Gartenstadt Bergacker is a replacement project for a 70-year-old housing estate in Zürich-Affoltern, with around 270 apartments of 1.5 to 5.5 rooms distributed across six slab-type buildings arranged around courtyard gardens. Almost all apartments have two outdoor spaces (loggia, balcony or terrace with private garden). The project aims for SNBS Gold certification and will be built in two stages, with the first stage ready for occupancy at the earliest in 2031.
Coming soonZHKüngenmatt
Zürich, Zurich
Online since May 2022 · checked 3 days ago
149 homes
The Küngenmatt project replaces a housing estate more than 80 years old in district 3 of Zurich with two new timber buildings of five storeys plus attic, comprising 149 rental apartments of 1.5 to 5.5 rooms, 19 of which are designed for seniors. It is being developed by a real estate fund of UBS Fund Management (Switzerland) AG, with Minergie and greenproperty Gold certifications and heating via geothermal probes. Construction is scheduled to begin in 2028 due to objections, with first occupancy in 2031.
Coming soonZHWohnigdachs
Dielsdorf, Zurich
Online since February 2022 · checked 3 days ago
15 homes
Wohnigdachs is a housing cooperative in Dielsdorf developing the Sulzer site, two minutes from the railway station. The project provides for approximately 15 dwellings on 4,530 square metres, including the new "Gartenhaus" building and the conversion of the existing villa. The cooperative places emphasis on community life, ecology and a sustainable mobility concept.
Coming soonZHWohnen im Oberdorf
Bassersdorf, Zurich
Online since January 2022 · checked 2 days ago
New residential development in Bassersdorf (ZH). The website indicates that new homes are being created and invites visitors to return at a later date.
Coming soonZHWeiterentwicklung Letten Quartier
Zürich, Zurich
Online since June 2021 · checked 4 days ago
The BEP cooperative, together with the City of Zurich (IMMO) and the SBB, is studying the development of the Letten quarter in Zurich in order to offer more affordable non-profit housing for all stages of life. Following a test planning exercise and a first participation phase, a vision for the future is available and feasibility studies are underway. Construction is not expected to begin before 2030, and will proceed in stages.
Coming soonZHFrohburg Gartensiedlung
Zürich, Zurich
Online since September 2018 · checked 3 days ago
660 homes
Helvetia replaces the Frohburg garden city in Zurich-Oerlikon, built in 1951, with a new dense and green neighbourhood of angled streets of four to seven storeys. The number of homes will rise from 307 to around 660, with affordable rents in the north, a mid-range segment in the south and a student building. The project is in the approval phase, with the first homes expected around 2029.
Coming soonZHProjekt Ensemble
Zürich, Zurich
Online since June 2017 · checked 2 days ago
800 homes
The Ensemble project, on the Hardturm site in Zurich (Kreis 5), comprises a 18,000-seat football stadium, a cooperative with 174 non-profit apartments (2.5 to 6.5 rooms) and two 137-metre residential towers offering rental apartments of 2.5 to 4.5 rooms as well as commercial spaces. Nearly 800 apartments are planned for more than 1,500 residents. The project is in its legal phase, with construction start hoped for around 2027.
Coming soonZHDolder Waldhaus
Zürich, Zurich
Online since April 2010 · checked 3 days ago
The Dolder Waldhaus, a former hotel from the 1970s in Zurich-Hottingen, is undergoing a complete renovation to become a living complex with rental apartments ranging from studios to 6.5-room apartments. The project also includes coworking spaces, a public restaurant with terrace and a fitness room for tenants. Works began in 2026 and the first move-ins are planned for 2030.
Do not miss the next ones
Get an e-mail each morning with the new projects on the market, nationally or by canton.