
Ersatzneubau Kornhaus-/Rötelstrasse
Zürich, Zurich
The project
Replacement of the Kornhaus-/Rötelstrasse housing estate (1923/24) in Zurich-Unterstrass with a new complex of 96 rental apartments and two studios, realised by the Dr. Stephan à Porta foundation. Works began at the end of September 2024 and move-in is planned for autumn 2027. The apartments offer a variety of layouts, with oriel windows facing the street and loggias or balconies.
Automatic translation of the original French description.
Images
Details
- Town
- Zürich
- Canton
- Zurich
- Address
- Kornhausstrasse 48-52 und Rötelstrasse 17-29
- Postcode
- 8006
- Developer
- Dr. Stephan à Porta-Stiftung, Zürich
- Architect
- Rothen Architektur GmbH, Winterthur
- Completion
- septembre 2027
- Sales start
- avril 2027
Information from the developer, collected on 05 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.