Dorfplatz 13
Coming soon

Dorfplatz 13

Zumikon, Zurich

35 homesMixed

The project

The Dorfplatz 13 project in Zumikon replaces the former Schweizer butcher's shop and connects with the new Dorfplatz. It offers a restaurant (village square dining) as well as approximately 35 rental apartments spread across two buildings, designed by the offices Baukontor and Stiller Projects. The public inquiry took place in summer 2026 and completion is planned for 2029.

Automatic translation of the original French description.

Images

Details

Town
Zumikon
Canton
Zurich
Unit types
2.5, 3.5 et 4.5 pièces
Architect
Baukontor / Stiller Projects (ARGE Baukontor Stiller)
Completion
janvier 2029

Information from the developer, collected on 21 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology

Other projects in the canton of Zurich

All projects in Zurich →