Separate Wastewater System in Mézières FR
Impasse du Broillet, Mézières
For professionalspro
The project is the separation of the wastewater drainage network in the Nord-Berlens sector of Mézières, with a request for an exemption from protection rules for trees, hedges and copses outside forests. For professionals, this means civil engineering and drainage works on the sewage and stormwater network; the exact scale is not specified, and the application has only been submitted, not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Mise en séparatif du réseau d’évacuation des eaux du secteur Nord-Berlens, avec dérogation aux mesures de protection des boisements hors forêt protégés. Demande de dérogation: aux mesures de protection des boisements hors forêt (arbres, haies, bosquets).
Progress
Filed on 2 October 2026 · status as of 2 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Two Buildings with 8 Apartments in Villaz FRVillaz · FR · 09.10.2026- Renovation of a Farm Dwelling in Le Châtelard FRLe Châtelard · FR · 09.10.2026
Photovoltaic Panels on Condominium Building in Gibloux FRGibloux · FR · 02.10.2026- Two Twin Villas in Gibloux FRGibloux · FR · 02.10.2026
Construction of 11 Apartments in Villarzel VDVillarzel · VD · 14.11.2025- Studio and Apartment Created in Autigny FRAutigny · FR · 02.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.