Two Buildings with 8 Apartments in Villaz FR
Villaz-Saint-Pierre, Chemin du Blessonney 1, 7
Get new building permits filed in Villaz by e-mail
For professionalspro
The project involves building two apartment buildings with 4 flats each, 8 homes in total, each fitted with an air-to-water heat pump. For trade professionals, this means substantial structural, heating and outdoor works, at a stage where the building permit application has been submitted but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction of 2 apartment buildings with 4 apartments each, with an air-water heat pump for each building. Application for exemption from the protection measures for woodland outside forests (trees, hedges, groves). Exemption requests: from the municipal road, exemption for the parking spaces along the road; from the protection measures for woodland outside forests (trees, hedges, groves), replacement of trees; from the law and/or regulations, for Article 19 RCU para. 2, for new collective buildings (Art. 57 ReLATeC), only the visitor parking spaces will be located outside
Automatic translation of the official notice published in French.
Progress
Filed on 9 October 2026 · status as of 9 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
15-Unit Residential Building in Villaz FRVillaz · FR · 06.11.2026
Farmhouse Attic Conversion in Villaz FRVillaz · FR · 06.11.2026
Horticultural Hangar and Showroom in Villaz FRVillaz · FR · 30.10.2026
Rooftop Photovoltaic Installation in Massonnens FRMassonnens · FR · 20.11.2026
Separate Wastewater System in Mézières FRMézières · FR · 02.10.2026
Agricultural Operations Building in Romont FRRomont · FR · 13.11.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.