Two Buildings with 8 Apartments in Villaz FR
Villaz-Saint-Pierre, Chemin du Blessonney 1, 7
For professionalspro
The project involves building two apartment buildings with 4 flats each, 8 homes in total, each fitted with an air-to-water heat pump. For trade professionals, this means substantial structural, heating and outdoor works, at a stage where the building permit application has been submitted but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction de 2 immeubles de 4 appartements avec PAC air-eau pour chaque bâtiment. Demande de dérogation aux mesures de protection des boisements hors forêt (arbres, haies, bosquets). Demandes de dérogation: à la route communale, dérogation pour les places de parking le long de la route; aux mesures de protection des boisements hors forêt (arbres, haies, bosquets), remplacement des arbres; à la loi et/ou aux règlements, pour l’article 19 RCU al. 2, pour les nouvelles constructions collectives (art. 57 ReLATeC), seules les places pour les visiteurs seront situées à l’extérieur
Progress
Filed on 9 October 2026 · status as of 9 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
- Separate Wastewater System in Mézières FRMézières · FR · 02.10.2026
Photovoltaic Panels on Condominium Building in Gibloux FRGibloux · FR · 02.10.2026
Construction of 11 Apartments in Villarzel VDVillarzel · VD · 14.11.2025- Two Twin Villas in Gibloux FRGibloux · FR · 02.10.2026
- Studio and Apartment Created in Autigny FRAutigny · FR · 02.10.2026
- Renovation of a Farm Dwelling in Le Châtelard FRLe Châtelard · FR · 09.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.