Grouped Villas in Collonge-Bellerive GE
19B, Chemin des Champs-de-Chaux, Collonge-Bellerive
Get new building permits filed in Collonge-Bellerive by e-mail
For professionalspro
Building permit application for four contiguous villas in Collonge-Bellerive (GE), built to very high energy performance, with a bicycle shelter, outdoor parking, fences, four heat pumps, rooftop solar panels and an outdoor summer kitchen. For professionals, this means structural, excavation, insulation, heating and roofing work across four buildings; the application has been filed but is not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction of four adjoining villas THPE (30%) - construction of a bicycle shelter and garden - outdoor parking - fencing - installation of 4 heat pumps and roof solar panels - outdoor developments - summer kitchen on the roof - felling and/or pruning of trees outside forest (RCVA)
Automatic translation of the official notice published in French.
Progress
Filed on 19 May 2026 · status as of 26 May 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Two New Houses in Collonge-Bellerive GECollonge-Bellerive · GE · 19.10.2026
Storey Addition to a House with Dwelling in Collonge-Bellerive GECollonge-Bellerive · GE · 04.11.2026
Sidewalk on Route d'Hermance in Collonge-Bellerive GECollonge-Bellerive · GE · 06.11.2026
Grouped Houses with Underground Garage in Collonge-Bellerive GECollonge-Bellerive · GE · 21.10.2026
Two Villas with Swimming Pools in Collonge-Bellerive GECollonge-Bellerive · GE · 20.10.2026
Extension and Renovation of a Villa in Collonge-Bellerive GECollonge-Bellerive · GE · 23.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.