Two New Houses in Collonge-Bellerive GE
7, chemin de Botterel, Collonge-Bellerive
Get new building permits filed in Collonge-Bellerive by e-mail
For professionalspro
Two new houses are planned in Collonge-Bellerive, built to a 22% HPE energy standard, with an outdoor pool, a heat pump and geothermal probes. For trade professionals, this involves structural work, earthworks, heating and outdoor works, including tree felling and the raising of the secondary house. This is a modified version of an initial project: the application has been submitted and is not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction of two houses (22% HPE) – outdoor swimming pool – heat pump – geothermal probes – felling of trees – raising of the secondary residence and interior modifications – modifications to the initial project.
Automatic translation of the official notice published in French.
Progress
Filed on 19 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Storey Addition to a House with Dwelling in Collonge-Bellerive GECollonge-Bellerive · GE · 04.11.2026
Sidewalk on Route d'Hermance in Collonge-Bellerive GECollonge-Bellerive · GE · 06.11.2026
Grouped Houses with Underground Garage in Collonge-Bellerive GECollonge-Bellerive · GE · 21.10.2026
Two Villas with Swimming Pools in Collonge-Bellerive GECollonge-Bellerive · GE · 20.10.2026
Extension and Renovation of a Villa in Collonge-Bellerive GECollonge-Bellerive · GE · 23.10.2026
Villa Conversion with Swimming Pool in Collonge-Bellerive GECollonge-Bellerive · GE · 09.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.