Grouped Housing in Collonge-Bellerive GE
2, Chemin des Bossonailles, Collonge-Bellerive
Get new building permits filed in Collonge-Bellerive by e-mail
For professionalspro
A grouped housing building with very high energy performance is planned in Collonge-Bellerive, with an underground car park, geothermal probes, and the felling or pruning of trees. For trade professionals, this mainly means excavation, structural work and geothermal heating; the scale and number of dwellings are not specified in the file. The application has been submitted and is not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction of a grouped housing building (THPE) with underground car park - geothermal probes - felling and/or pruning of trees outside forest (RCVA)
Automatic translation of the official notice published in French.
Progress
Filed on 17 November 2025 · status as of 25 November 2025
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Patrice Reynaud Architecte
M Patrice C Reynaud Route de Frontenex, 78 Case postale 6494 CH-1211 Genève 6
Other projects nearby
Two New Houses in Collonge-Bellerive GECollonge-Bellerive · GE · 19.10.2026
Storey Addition to a House with Dwelling in Collonge-Bellerive GECollonge-Bellerive · GE · 04.11.2026
Sidewalk on Route d'Hermance in Collonge-Bellerive GECollonge-Bellerive · GE · 06.11.2026
Grouped Houses with Underground Garage in Collonge-Bellerive GECollonge-Bellerive · GE · 21.10.2026
Two Villas with Swimming Pools in Collonge-Bellerive GECollonge-Bellerive · GE · 20.10.2026
Extension and Renovation of a Villa in Collonge-Bellerive GECollonge-Bellerive · GE · 23.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.