
Zukunft Isengrundstrasse
Adliswil, Zurich
The project
Complete renovation of the site at Isengrundstrasse 6, 8, 10 and 12 in Adliswil by Swiss Life: the buildings from 1952/53 are being replaced by 72 apartments and 5 terraced houses, in three buildings of three to five storeys. The project meets the SNBS Gold standard, with underground parking and landscaped outdoor areas. First letting began in August 2026, with handover planned for spring 2027.
Automatic translation of the original French description.
Images
Details
- Town
- Adliswil
- Canton
- Zurich
- Address
- Isengrundstrasse 6, 8, 10, 12
- Unit types
- appartements de 1.5 à 5.5 pièces, maisons mitoyennes
- Developer
- Swiss Life
- Architect
- Architektick AG
- Completion
- mars 2027
- Sales start
- août 2026
Information from the developer, collected on 05 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.