
Serenity Mörigen
Mörigen, Bern
The project
At Quellenweg 4 in Mörigen, in the immediate vicinity of Lake Biel, a building of four condominium apartments with a high-quality ventilated timber facade. The apartments offer generous, adaptable layouts in a quiet and desirable setting. Occupancy is planned from summer 2027.
Automatic translation of the original French description.
Details
- Town
- Mörigen
- Canton
- Bern
- Address
- Quellenweg 4
- Unit types
- 3.5 pièces, 4.5 pièces, attique 4.5 pièces
- Completion
- juin 2027
Information from the developer, collected on 30 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Mörigen
Not the right one? Get an e-mail when a new development reaches the market in Mörigen.
Other projects in the canton of Bern
All projects in Bern →
Registration openNewBENeubau Krauchthal
Krauchthal, Bern
Online since October 2026 · checked 12 days ago
7 homes
Seven modern and sustainable condominium apartments of 2.5 to 4.5 rooms are planned at Länggasse 29 in Krauchthal. The project combines nature-oriented living with contemporary architecture, with attractive outdoor spaces and a high standard of finish. It includes an underground garage and a lift, with construction work scheduled to start in spring 2027.
To be confirmedBEZentrum Worben
Worben, Bern
58 homes
In the centre of Worben, bonainvest is building a residential complex with 42 rental apartments and 12 condominium apartments (PPE), as well as the conversion of an existing farm into four rental apartments and two commercial spaces. The apartments meet the bonacasa construction standard and are equipped with modern technology. Works began at the end of April 2024, some apartments have been occupied since October 2025, and the 2nd phase is planned for spring 2026.
To be confirmedBEBachmatte
Schwarzenburg, Bern
31 homes
In the centre of the Bernese municipality of Schwarzenburg, directly on the village brook, bonainvest is building three residential buildings with 31 rental apartments. Works began in April 2026. The project was designed by ar3 architekten ag.