
Résidence MYRA
Lancy, Geneva
The project
The MYRA residence is a condominium building of 3 floors in Lancy, comprising 10 apartments (9 three-room and 1 four-room) built to the THPE standard, with a heat pump, rooftop photovoltaics and triple glazing. The apartments have private gardens, balconies or terraces and a storage room in the basement. All units are sold.
Automatic translation of the original French description.
Images
Details
- Town
- Lancy
- Canton
- Geneva
- Unit types
- 3 pièces, 4 pièces
- Broker
- Daudin & Cie SA
- Contact
- t.camerlo@daudin.ch
- Phone
- +41 79 212 47 30
Information from the developer, collected on 09 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Lancy
Not the right one? Get an e-mail in the morning when a new development reaches the market in Lancy.
Other projects in the canton of Geneva
All projects in Geneva →
For rentGELes Résidences d'Anières
Anières, Geneva
checked 3 days ago
9 homes
Les Résidences d'Anières is a project of 9 new high-end apartments of 4 to 7.5 rooms, offered for rent on the heights of Anières, amid vineyards and fields. The building includes around twenty underground parking spaces and a penthouse of approximately 260 m² with more than 120 m² of terraces and lake views. The energy concept meets the HPE standard (geothermal heat pump, photovoltaics, geocooling).
For saleGELa Loge du Rhône
Genève, Geneva
checked 4 days ago
from CHF 5’700’000
Exceptional 317 m² condominium apartment on the banks of the Rhône in the heart of Geneva, with a 56 m² terrace. Two bespoke fit-out variants are offered, with two suites and generous reception rooms. The project is developed by Kadenco SA and marketed by Pilet & Renaud Transactions.
For saleGECoudriers 39B
Le Grand-Saconnex, Geneva
checked today
2 villas · CHF 2’850’000 – CHF 2’950’000
Two contemporary 5.5-room villas in Grand-Saconnex, spread over three levels, with a fenced private garden, terrace and two covered parking spaces. The project is designed around light and family life, to the THPE standard, and buyers choose their finishes. Handover is scheduled for autumn 2028.