
Neubourg 21
Neuchâtel, Neuchâtel
The project
Neubourg 21 is a project in Neuchâtel whose site is currently under construction. Information about the project and its launch will be communicated shortly.
Automatic translation of the original French description.
Details
- Town
- Neuchâtel
- Canton
- Neuchâtel
- Address
- Neubourg 21
- Postcode
- 2000
- Contact
- neubourg21@ikmail.com
Information from the developer, collected on 25 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Neuchâtel
Not the right one? Get an e-mail when a new development reaches the market in Neuchâtel.
Other projects in the canton of Neuchâtel
All projects in Neuchâtel →
For saleNewNEVinea
Cressier, Neuchâtel
Online since October 2026 · checked 4 days ago
21 homes · CHF 390’000 – CHF 525’000
Vinea is a development of 21 apartments of 2.5 and 3.5 rooms in Cressier (NE), in the Argilles district, with views over the wooded vineyard slopes. The apartments offer outdoor spaces (balcony, terrace or garden), quality materials and an underground car park. A central playground and large shared green spaces are planned.
To be confirmedNewNERive-Haute
Hauterive, Neuchâtel
Online since September 2026 · checked 2 days ago
4 villas
Rive-Haute brings together four contemporary semi-detached villas of 4.5 rooms each in Hauterive, with a 180° panoramic view over Lake Neuchâtel, the Alps and the forest in the background. The villas offer large picture windows, ground-level terraces, a private cellar and laundry room, as well as an underground garage. Kitchen, sanitary fittings, parquet flooring and tiling can be chosen at the tenant's discretion, with key handover planned for the end of 2028.
For saleNewNERésidence Plein Sud
Bevaix, Neuchâtel
Online since September 2026 · checked 12 days ago
12 homes
A project of 12 condominium apartments in Bevaix, on the shore of Lake Neuchâtel, in a quiet neighbourhood. The building, facing due south, has three identical floors with 2.5 to 4.5-room apartments, balconies or terraces with private gardens. An underground car park with 15 spaces equipped for electric vehicles completes the project, with handover scheduled for summer 2027.