
VESTA Alpine Chalets
Lauchernalp, Valais
The project
Vesta Alpine Chalets offers 17 detached luxury chalets of 160 to 220 m² in Lauchernalp, at an altitude of approximately 2000 m, with direct access to the slopes. Each chalet includes a private wine cellar, gym, sauna, hammam and outdoor jacuzzi. Phase 1 of 3 is open for reservations, with completion scheduled for winter 2027.
Automatic translation of the original French description.
Images
Details
- Town
- Lauchernalp
- Canton
- Valais
- Unit types
- chalets indépendants de 160 à 220 m²
- Minimum price
- CHF 1’760’000
- Developer
- Legacy Investments AG
- Completion
- décembre 2027
Information from the developer, collected on 10 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Valais
All projects in Valais →
For saleVSCime de l'Est
Vérossaz, Valais
checked today
8 homes · CHF 775’000 – CHF 795’000
Cime de l'Est is a residential development of eight 4.5-room apartments in Vérossaz, at the foot of the Dents du Midi. Spread across two small two-storey buildings, the homes offer three bedrooms, a large terrace or a private balcony, and finishes selectable by the buyer. Handover is scheduled for 2028.
For saleLast unit available!NewVSRésidence Le Cormayeur
Vollèges, Valais
Online since August 2026 · checked today
8 homes · from CHF 920’000
Résidence Le Cormayeur offers 8 new 4.5-room apartments in Vollèges, spread across four contemporary villas each housing two apartments, intended as primary residences. The project, certified Minergie®, combines contemporary architecture with integration into the alpine character of the Valais village of Vollèges, in the Val de Bagnes. Handover is scheduled for December 2028, with prices from CHF 920'000.-.
For saleVSMFH Friedheim
St. Niklaus, Valais
Online since June 2026 · checked yesterday
8 homes · CHF 680’000 – CHF 1’000’000
New chalet-style building in St. Niklaus, comprising four 4.5-room apartments and four 5.5-room apartments, energy-efficient, barrier-free access by lift, with a photovoltaic system, cellar and parking spaces. Construction is in progress and key handover is scheduled from autumn 2027.