
VERENAHOF
Zürich, Zurich
The project
A historic building of character at Badenerstrasse 332/334, near Albisriederplatz in Zurich, is fully renovated and offered for first letting. It comprises 19 apartments of 2.5 to 4.5 rooms as well as an office, with terraces, balconies or winter gardens depending on the apartment. Move-in to the apartments is planned for 1 November 2026.
Automatic translation of the original French description.
Images
Details
- Town
- Zürich
- Canton
- Zurich
- Address
- Badenerstrasse 332/334
- Unit types
- 2.5, 3.5 et 4.5 pièces
- Broker
- immoSTEG AG
- Architect
- INTER CONCEPT
- Completion
- novembre 2026
- Contact
- m.pozhari@immosteg.ch
- Phone
- 044 454 23 93
Information from the developer, collected on 09 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.