
Talgut Ost
Ittigen, Bern
The project
Talgut Ost is a new central quarter in Ittigen, with high-quality outdoor spaces and abundant greenery. The project provides 149 homes (rental and condominium ownership) as well as about 5'000 m² of office, commercial and retail space. Construction is planned between 2027 and 2030.
Automatic translation of the original French description.
Details
- Town
- Ittigen
- Canton
- Bern
- Developer
- Seraina Invest Developers AG
- Completion
- janvier 2030
- Contact
- remo.ehrlich@serainainvest.ch
- Phone
- +41 58 458 44 38
Information from the developer, collected on 23 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Ittigen
Not the right one? Get an e-mail in the morning when a new development reaches the market in Ittigen.
Other projects in the canton of Bern
All projects in Bern →
For rentNewBESchnyder Areal
Biel, Bern
Online since November 2026 · checked today
36 homes
The Schnyder Areal is a rental housing project located at Zentralstrasse 127a in Biel, spread across buildings A and B. The apartments of 1.5 to 4.5 rooms, ranging from 46 to 105 m², are offered for rent and available from 1 October 2027.
For saleBEArboréa
Gampelen, Bern
checked yesterday
from CHF 885’000
Arboréa is a project located in Gampelen, in the heart of the Three Lakes region, 150 m from the railway station. The property presented is a 4.5-room ground-floor apartment of 135 m², with a 61 m² living room, private garden, heat pump and photovoltaic panels. Built with local materials and regional companies, it is announced for the end of 2027.
For saleNewBEMattenbodenweg
Rumisberg, Bern
Online since October 2026 · checked yesterday
5 villas
Five detached and semi-detached houses of 5.5 or 6.5 rooms on the edge of the village of Rumisberg, between meadows and fruit trees, with private garden, terrace and open views over the Mittelland. The houses are spread over three or four levels, with light rendered facades, anthracite roof tiles and oak parquet flooring. Handover planned for the 4th quarter of 2027.