
Yuna Green
Birmensdorf, Zurich
The project
Yuna Green is a residence of nine 4.5-room condominium apartments in Birmensdorf (ZH), close to the village centre and a natural recreation area. The concept emphasises open, bright spaces combining living room, kitchen and dining area, with large balconies, terraces and green spaces. The project focuses on sustainability with a geothermal heat pump, TABS system, photovoltaics and KNX smart home control.
Automatic translation of the original French description.
Images
Details
- Town
- Birmensdorf
- Canton
- Zurich
- Unit types
- 4.5 pièces
- Minimum price
- CHF 2’170’000
- Maximum price
- CHF 2’770’000
- Developer
- REFA Enterprises AG
- Broker
- REFA Hospitality AG
- Contact
- info@refaenterprises.ch
- Phone
- +41 44 777 79 42
Information from the developer, collected on 26 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.