
Sunnefäld Eglisau
Eglisau, Zurich
The project
Sunnefäld offers 27 modern rental apartments spread across three buildings in Eglisau (ZH), in a quiet setting with views of sunflower fields and orchards. The construction features high-quality finishes and sustainable technologies (photovoltaics, heat pumps with geothermal probes, underfloor heating). Handover is planned for autumn 2026.
Automatic translation of the original French description.
Images
Details
- Town
- Eglisau
- Canton
- Zurich
- Address
- Roggenfarstrasse 74/76/78
- Postcode
- 8193
- Unit types
- 3.5 pièces, 4.5 pièces
- Developer
- Sunnefäld AG
- Broker
- a&m Consulting
- Architect
- Hohermuth Architektur AG
- Completion
- septembre 2026
- Contact
- info@a-m.ch
- Phone
- 044 879 19 00
Information from the developer, collected on 26 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.