
Verdea 60
Egerkingen, Solothurn
The project
Verdea 60 is a new rental building at Bahnhofstrasse 60 in Egerkingen, a three-minute walk from the railway station and the Gäupark shopping centre. For first letting, 21 apartments of 1½ to 3½ rooms as well as three 4½-room attic apartments are available. The apartments feature high-quality finishes, balconies, terraces or garden seating areas, and a lift.
Automatic translation of the original French description.
Images
Details
- Town
- Egerkingen
- Canton
- Solothurn
- Address
- Bahnhofstrasse 60
- Unit types
- 1.5 pièces, 2.5 pièces, 3.5 pièces, attiques 4.5 pièces
- Completion
- avril 2027
Information from the developer, collected on 27 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Egerkingen
Not the right one? Get an e-mail in the morning when a new development reaches the market in Egerkingen.
Other projects in the canton of Solothurn
All projects in Solothurn →
To be confirmedSOEinfamilienhäuser “Nettenberg”
Hochwald, Solothurn
6 villas
Six detached houses are under construction in Hochwald (SO), in a quiet, sunny setting that combines modern living with sustainable construction. Each house features open living areas overlooking the garden, an additional bedroom, a master suite with dressing room and a large roof terrace. Each house also includes a garden, a carport and storage spaces, with an optional basement.
For saleSONeumatt Fulenbach – Natürlich wohnen
Fulenbach, Solothurn
21 homes · from CHF 945’000
The «Neumatt» development in Fulenbach comprises 21 condominium apartments spread across three buildings, in a quiet and well-connected location. The 3½, 4½ and 5½-room apartments have a lift and an individual storage cellar, and the penthouses are directly accessible by lift. Move-in is planned for May 2027.
For saleSONeumatt – Natürlich wohnen
Fulenbach, Solothurn
21 homes · from CHF 755’000
The «Neumatt» development in Fulenbach comprises 21 condominium apartments with 3½, 4½ and 5½ rooms, spread across three buildings, in a quiet and well-connected setting. The apartments are accessible by lift, each has a cellar, and there is an underground garage with visitor parking. Handover of keys is planned for May 2027.