
Lindenbaum
Oberweningen, Zurich
The project
In Oberweningen in the Zurich Unterland, the Lindenbaum project comprises three upscale residential buildings with timber facades and a modern design, close to the train station and a bus stop. Two buildings offer rental apartments and commercial spaces, while the third houses condominium apartments. The project, currently in the shell construction phase, aims for the Minergie standard, a photovoltaic system and green spaces with a playground.
Automatic translation of the original French description.
Images
Details
- Town
- Oberweningen
- Canton
- Zurich
- Unit types
- 4.5 pièces
- Broker
- Prestige Immobilien AG
Information from the developer, collected on 19 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.