
Rebmatt
Villigen, Aargau
The project
New building of eight condominium apartments at Rebmattweg 1a, in the heart of the village of Villigen, with two gables blending into the historic centre. The 3.5 and 4.5-room apartments (99 to 133 m²) each have a garden, a terrace or a loggia, with a lift from the underground car park to the attic. The car park has 13 spaces.
Automatic translation of the original French description.
Images
Details
- Town
- Villigen
- Canton
- Aargau
- Address
- Rebmattweg 1a
- Postcode
- 5234
- Unit types
- 3.5 pièces, 4.5 pièces
- Minimum price
- CHF 929’000
- Maximum price
- CHF 1’227’000
Information from the developer, collected on 14 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Aargau
All projects in Aargau →
For saleNewAGArca
Oftringen, Aargau
Online since September 2026 · checked 4 days ago
6 homes · CHF 799’000 – CHF 1’290’000
An appealing residential building is under construction in the centre of the village of Oftringen, comprising six modern owner-occupied apartments of 3.5 to 5.5 rooms, with high-end finishes and carefully considered architecture. Large glazed surfaces create bright rooms, while carefully selected natural materials create a warm ambience. The project enjoys an ideal location in the heart of Oftringen, close to recreational areas and the Wiggertal motorway interchange.
For saleNewAGSuhrano
Suhr, Aargau
Online since August 2026 · checked 7 days ago
from CHF 690’000
Suhrano is a new condominium ownership (PPE) development in Suhr, near Aarau and 450 m from the railway station. It offers 3.5 to 5.5-room apartments with a garden or balcony, a common house, car-free courtyards and district heating. Key handover from 2027.
To be confirmedNewAGAureus Homes — Gränichen, Herbstweg
Gränichen, Aargau
Online since July 2026 · checked 6 days ago
Aureus Homes is developing modern semi-detached houses in Gränichen (Herbstweg), built in solid timber (CLT) with a net living area of 131 m² and more than 33 m² of storage space. The project focuses on contemporary design, solid construction and fast delivery, approximately 5 months after contract signing.