
Stierwisen
Wangen, Zurich
The project
Stierwisen est un projet de 44 appartements modernes de 2.5 à 5.5 pièces répartis dans 6 immeubles à Wangen, dans le Glattal, à environ 20 minutes de la gare centrale de Zurich. Les logements disposent de loggias ou de terrasses, d'une cuisine de qualité, d'un lave-linge et d'un sèche-linge individuels. Construction durable avec pompe à chaleur et installation photovoltaïque, ainsi qu'un parking souterrain de 47 places.
Images
Details
- Town
- Wangen
- Canton
- Zurich
- Unit types
- 2.5, 3.5, 4.5 et 5.5 pièces
- Developer
- St.Galler Pensionskasse Immobilien
- Completion
- juin 2028
- Contact
- stierwisen@sgpk.ch
- Phone
- +41 58 228 77 77
Information from the developer, collected on 21 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Wangen
Not the right one? Get an e-mail in the morning when a new development reaches the market in Wangen.
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHUrban Gardens
Embrach, Zurich
21 homes
Urban Gardens is a residential building in condominium ownership with underground garage in Embrach, under the motto "Private. Different. Central". The project comprises 21 apartments of 2.5, 3.5 and 4.5 rooms, approximately 69 to 121 m², on a plot of approximately 2362 m².
For saleNewZHRütiwiese⁶
Herrliberg, Zurich
Online since November 2026 · checked today
6 villas
Rütiwiese⁶ is a project of six new semi-detached houses in Herrliberg, in a quiet, sunny setting near Lake Zurich with unobstructed views. Each house offers approximately 180 m² of living space, a private garden, a roof terrace and a private pool. Move-in is planned for around 2028.
For saleNewZHSerenity
Zürich, Zurich
Online since November 2026 · checked yesterday
11 homes · CHF 1’350’000 – CHF 2’325’000
Serenity is a new building of eleven condominium apartments (2.5, 3.5 and 4.5 rooms) at Carl-Spitteler-Strasse 50, in District 7 of Zurich. Behind a light beige facade, each unit has a balcony, a terrace or an outdoor space, with parquet flooring, large windows, and a geothermal heat pump and photovoltaic system. Construction is scheduled to begin in May 2027.