
Baufeld H
Lyss, Bern
The project
At Bahnhofstrasse 32 in Lyss, a new 13-storey residential building with 75 rental apartments, ranging from studios to compact family apartments, will be completed by 2029. The ground floor features a meeting space, and the first floor a coworking area and workshops, while a continuous perimeter balcony band gives each apartment a private outdoor space. Construction is scheduled to begin in 2027, with completion planned for late 2029.
Automatic translation of the original French description.
Images
Details
- Town
- Lyss
- Canton
- Bern
- Address
- Bahnhofstrasse 32
- Postcode
- 3250
- Completion
- décembre 2029
Information from the developer, collected on 19 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Bern
All projects in Bern →
Registration openBENeubau Krauchthal
Krauchthal, Bern
checked 3 days ago
7 homes
Seven modern and sustainable condominium apartments of 2.5 to 4.5 rooms are planned at Länggasse 29 in Krauchthal. The project combines nature-oriented living with contemporary architecture, with attractive outdoor spaces and a high standard of finish. It includes an underground garage and a lift, with construction work scheduled to start in spring 2027.
For saleBEHintergasse Niederbipp
Niederbipp, Bern
checked 10 days ago
8 homes · CHF 690’000 – CHF 855’000
A modern building of eight condominium apartments at Hintergasse 21 in Niederbipp, comprising six 4.5-room apartments and two 3.5-room apartments. The contemporary architecture offers large glazed façades, quality materials, and balconies or outdoor seating areas. Shops, schools and public transport are in the immediate vicinity.
For saleBELa Fenette
St-Imier, Bern
checked 6 days ago
10 villas · CHF 590’000 – CHF 725’000
La Fenette is a development of ten terraced houses arranged in three groups in St-Imier, built with prefabricated timber frame construction, an air-to-water heat pump and photovoltaic panels. Each house has its own entrance, a private garden, a parking space and a cellar, with customisable finishes. The project is located about a 10-minute walk from the station and the centre of St-Imier.