
AMALFI DUE
Zürich, Zurich
The project
Amalfi Due is a new development located in the Zurich district of Kreis 3, at Badenerstrasse 423-425a, with occupancy from 1 August 2026. It combines two connected building sections, Città (lofts and duplex studios) and Parco (apartments of 2.5 to 5.5 rooms overlooking the Heiligfeld park), around an orangery housing an art installation. The apartments are offered for rent.
Automatic translation of the original French description.
Images
Details
- Town
- Zürich
- Canton
- Zurich
- Address
- Badenerstrasse 423, 423a, 425, 425a
- Unit types
- 1.5 à 5.5 pièces, lofts (mini et maxi), ateliers duplex
- Broker
- Ledermann Management AG
- Completion
- août 2026
Information from the developer, collected on 12 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
For rentZHSchindler-Areal Schlieren
Schlieren, Zurich
checked today
232 homes
The Schindler-Areal in Schlieren comprises 232 new rental apartments of 1.5 to 5.5 rooms, as well as 14 commercial spaces, distributed across six buildings connected by a park. The buildings meet the Minergie-P standard and are equipped with geothermal probes and photovoltaic panels. Leasing and move-in to the apartments take place in three stages, between December 2026 and September 2027.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked yesterday
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 4 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.