
Überbauung Hinderdorf Münsingen
Münsingen, Bern
The project
In the centre of Münsingen, building land reserves totalling 22'500 m² are spread across two sites, developed in two stages. The project provides for measured densification with rental and owner-occupied housing, as well as commercial and service spaces along Bernstrasse. The aim is to create a forward-looking neighbourhood linked by well-maintained outdoor spaces.
Automatic translation of the original French description.
Images
Details
- Town
- Münsingen
- Canton
- Bern
- Developer
- Baugesellschaft Hinderdorf
- Broker
- thomasgraf ag
- Architect
- GIM Architekten AG
Information from the developer, collected on 21 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
Other projects in the canton of Bern
All projects in Bern →
For sale and rentLast unit available!BEMuri Riedacker
Muri bei Bern, Bern
checked today
39 homes
Exclusive villa quarter south-east of Muri bei Bern, built from 2020 to 2022 by Frutiger AG. It comprises 30 owner-occupied apartments and nine rental apartments distributed across three-storey buildings, set in a landscaped park with a water lily pond. The interior architecture is by atelier oï and the park by enea landscape architecture.
For rentBECiel 14
Bern, Bern
checked today
84 homes
Le Ciel 14 is a complex of two 14-storey towers located at Bahnstrasse 59 and 79 in Bern, comprising 84 fully renovated 2.5- and 3.5-room apartments. The apartments are offered for first-time rental after complete renovation, with open-plan kitchen, oak parquet flooring and private balcony. The neighbourhood, close to Europaplatz, offers excellent public transport connections and numerous shops.
For rentBEQ34 – Leben im Steinhof Burgdorf
Burgdorf, Bern
checked yesterday
99 homes
On the Steinhof site in Burgdorf, the Q34 development comprises four buildings with 99 rental apartments of 1½ to 5½ rooms, as well as commercial spaces, offices and a medical practice. The intergenerationally mixed neighbourhood is located next to Steinhof BLS railway station and is connected to district heating with photovoltaic panels. The first tenants have moved in, with completion of construction scheduled for spring 2026.