
Eptingerstrasse Muttenz
Muttenz, Basel-Landschaft
The project
Two five-storey buildings at 36 and 38 Eptingerstrasse, on the edge of the village of Muttenz, contain 40 rental apartments of 3.5 and 4.5 rooms (approx. 67 to 92 m²). The apartments are Minergie-certified and feature a balcony or outdoor seating area, parquet flooring, comfort ventilation and a rooftop photovoltaic system. First letting from September 2026, a few minutes from Basel by tram or train.
Automatic translation of the original French description.
Images
Details
- Town
- Muttenz
- Canton
- Basel-Landschaft
- Address
- Eptingerstrasse 36 und 38
- Unit types
- 3.5 pièces, 4.5 pièces
- Broker
- Kokon Immobilien AG
- Completion
- septembre 2026
- Contact
- hallo@kokonimmo.com
- Phone
- 079 864 81 18
Information from the developer, collected on 30 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Muttenz
Not the right one? Get an e-mail when a new development reaches the market in Muttenz.
Other projects in the canton of Basel-Landschaft
All projects in Basel-Landschaft →
Registration openNewBLWohnpark Fichtenrain
Therwil, Basel-Landschaft
Online since October 2026 · checked 3 days ago
31 homes
Wohnpark Fichtenrain comprises 31 rental apartments of 2½ to 5½ rooms spread across four buildings, on the heights of Therwil, 20 minutes from Basel. Surrounded by existing trees, each apartment has a balcony or terrace, quality finishes and an underground garage. Construction is underway and move-in is scheduled from June 2027.
For saleNewBLAm Weieracker
Thürnen, Basel-Landschaft
Online since September 2026 · checked 6 days ago
15 villas · CHF 1’187’000 – CHF 1’697’000
The Am Weieracker project comprises 14 semi-detached houses and one detached villa of 5.5 to 6.5 rooms, each with its own outdoor space, on the quiet edge of the village of Thürnen (BL), 25 minutes from Basel. The houses offer 139 to 204 m² of living space, a parking space included in the price, an individual air-to-water heat pump and a choice of finishes depending on the progress of the construction. Move-ins are staggered from the 1st quarter of 2028.
Coming soonBLZentrum Süd
Reinach (BL), Basel-Landschaft
New construction project in Reinach (BL), for which land purchase contracts were concluded in 2025. The development plan procedure is ongoing and the start date of the works has not yet been set.