
Tre Fiori
Ottenbach, Zurich
The project
Tre Fiori is a development of six condominium apartments of 3.5 and 4.5 rooms in Ottenbach, in the Reuss valley, with geothermal heat pump, photovoltaic panels and integrated home automation. The south-east facing apartments feature large picture windows, balconies or terraces and an underground garage prepared for electric mobility. Move-in is possible from early 2026.
Automatic translation of the original French description.
Images
Details
- Town
- Ottenbach
- Canton
- Zurich
- Unit types
- 3.5 pièces, 4.5 pièces
- Minimum price
- CHF 1’331’000
- Maximum price
- CHF 1’331’000
- Developer
- Lerch & Partner Generalunternehmung AG
- Broker
- Lerch Promotionen AG
- Completion
- janvier 2026
- Contact
- verkauf@lerchpromotionen.ch
- Phone
- +41 55 610 47 46
Information from the developer, collected on 18 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.