
B19 - Familiäres Zuhause in Lachen am Zürichsee
Lachen, Schwyz
The project
New-build project for a semi-detached house (half of a double house) with 5.5 rooms in Lachen, a 2-minute walk from Lake Zurich. The interior fit-out can be personalised thanks to generous finishing budgets, and each half enjoys a private sphere while forming a harmonious whole, with a glazed terrace with sliding doors and a garden. Construction start in August 2026, move-in possible in autumn 2027.
Automatic translation of the original French description.
Details
- Town
- Lachen
- Canton
- Schwyz
- Address
- Birkenstrasse 19B
- Postcode
- 8853
- Unit types
- 5.5 pièces, maison double (DEFH)
- Broker
- Imfeld Immobilien
- Completion
- octobre 2027
- Phone
- +41 55 410 75 77
Information from the developer, collected on 28 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Lachen
Not the right one? Get an e-mail in the morning when a new development reaches the market in Lachen.
Other projects in the canton of Schwyz
All projects in Schwyz →
For rentSZResidenz Gasthaus Wylen
Wilen (Freienbach), Schwyz
checked yesterday
15 homes
The Résidence Gasthaus Wylen offers 3.5- to 5.5-room rental apartments on the site of the former restaurant, in the heart of the village of Wilen. The two-part building, built to Minergie standard, houses fifteen units with generous floor areas, terraces and views of the hills and Lake Zurich. The apartments feature high-end fittings, energy supplied by geothermal probes and photovoltaics, and an underground car park with 27 spaces.
For saleSZRésidence Aurea
Tuggen, Schwyz
checked 3 days ago
14 homes · CHF 1’380’000 – CHF 1’750’000
Résidence Aurea is an approved new development located at Zürcherstrasse 24 in Tuggen (SZ), with 14 units: apartments of 3.5 to 5.5 rooms, two penthouses and ten commercial studios. It offers an open view over the Linth plain and a sustainable energy concept (photovoltaics, geothermal probes, storage battery). Completion of the works is scheduled for 2028.
For saleSZ3 Doppel-Einfamilienhäuser im Chlifeld, Tuggen
Tuggen, Schwyz
6 villas
Three semi-detached houses are being built in the Chlifeld district in Tuggen, in a sunny and quiet location. Houses 1.1/1.2 are already sold and occupied, houses 2.1/2.2 are sold and will be occupied at the end of February 2027. Semi-detached house no. 3 is now for sale, with construction start planned for the end of February 2027.