
Poststrasse 1/3
Adliswil, Zurich
The project
In the heart of Adliswil, the Poststrasse 1/3 project offers 16 rental apartments (12 fully renovated and 4 newly built) of 2.5 to 4.5 rooms, a few steps from the Sihl and the station square. The apartments offer a high standard of fittings, with open kitchens equipped with V-ZUG appliances, private laundry columns, large wood-metal windows and fibre-optic connection. The building features an air-to-water heat pump, a ventilated façade, a lift and an underground garage prepared for e-mobility.
Automatic translation of the original French description.
Images
Details
- Town
- Adliswil
- Canton
- Zurich
- Address
- Poststrasse 1/3
- Unit types
- 2.5 pièces, 3.5 pièces, 4.5 pièces
- Completion
- mars 2023
Information from the developer, collected on 02 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
To be confirmedZHFlorastrasse 49
Uster, Zurich
checked today
8 homes
Florastrasse 49 is a cooperative project of eight apartments, featuring a large common room called "gRaum", intended for hosting events and moments of sharing. The apartments, ranging from 2 to 3.5 rooms, are managed by the small housing cooperative tRaum, in which an apartment rarely becomes available.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked today
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 3 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.