
Grächen Futura
Grächen, Valais
The project
Grächen Futura is a redevelopment project for the sports centre in Grächen, comprising an indoor leisure centre with play area, fitness and wellness facilities over approximately 800 m², surrounded by six wooden holiday houses-apartments (2.5, 3.5 and 4.5 rooms) as well as a building of primary residences. The project was approved by the population of Grächen on 23 October 2022, and the partial revision of the zoning plan was subsequently accepted on 13 December 2023.
Automatic translation of the original French description.
Images
Details
- Town
- Grächen
- Canton
- Valais
- Unit types
- 2.5, 3.5 et 4.5 pièces
- Architect
- SSA Architekten
Information from the developer, collected on 28 septembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Valais
All projects in Valais →
For saleVSCime de l'Est
Vérossaz, Valais
checked today
8 homes · CHF 775’000 – CHF 795’000
Cime de l'Est is a residential development of eight 4.5-room apartments in Vérossaz, at the foot of the Dents du Midi. Spread across two small two-storey buildings, the homes offer three bedrooms, a large terrace or a private balcony, and finishes selectable by the buyer. Handover is scheduled for 2028.
For saleLast unit available!NewVSRésidence Le Cormayeur
Vollèges, Valais
Online since August 2026 · checked today
8 homes · from CHF 920’000
Résidence Le Cormayeur offers 8 new 4.5-room apartments in Vollèges, spread across four contemporary villas each housing two apartments, intended as primary residences. The project, certified Minergie®, combines contemporary architecture with integration into the alpine character of the Valais village of Vollèges, in the Val de Bagnes. Handover is scheduled for December 2028, with prices from CHF 920'000.-.
For saleVSMFH Friedheim
St. Niklaus, Valais
Online since June 2026 · checked yesterday
8 homes · CHF 680’000 – CHF 1’000’000
New chalet-style building in St. Niklaus, comprising four 4.5-room apartments and four 5.5-room apartments, energy-efficient, barrier-free access by lift, with a photovoltaic system, cellar and parking spaces. Construction is in progress and key handover is scheduled from autumn 2027.