
Am Restelberg
Zürich, Zurich
The project
On the heights of the Zürichberg, in Zurich-Fluntern, two independent buildings offer 16 high-end owner-occupied apartments, with generous floor plans and private outdoor spaces. The range extends from 3½ and 4½-room apartments to exclusive penthouse apartments, with views of the greenery, the city and, in part, Lake Zurich. Detailed information will be available at the end of 2026, and VIP registration is open.
Automatic translation of the original French description.
Images
Details
- Town
- Zürich
- Canton
- Zurich
- Unit types
- 3.5 pièces, 4.5 pièces, attiques
- Broker
- Wüst und Wüst AG
- Contact
- stefanie.oechslin@wuw.ch
- Phone
- +41 44 388 58 40
Information from the developer, collected on 12 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Zurich
All projects in Zurich →
For rentZHAMALFI DUE
Zürich, Zurich
checked today
88 homes
Amalfi Due is a new development located in the Zurich district of Kreis 3, at Badenerstrasse 423-425a, with occupancy from 1 August 2026. It combines two connected building sections, Città (lofts and duplex studios) and Parco (apartments of 2.5 to 5.5 rooms overlooking the Heiligfeld park), around an orangery housing an art installation. The apartments are offered for rent.
Registration openNewZHBrunngasse 18
Männedorf, Zurich
Online since October 2026 · checked yesterday
5 homes
The historic building at Brunngasse 18 in Männedorf, a multi-family residence, is being carefully renovated to recover its original character: panelling, doors and the staircase are restored, and kitchens and bathrooms modernised. The five owner-occupied apartments will be put up for sale. Interested parties can register without obligation to be kept informed.
For rentZHRosinlistrasse 7
Wetzikon, Zurich
checked 4 days ago
15 homes
Rental project in Wetzikon (ZH) comprising 13 modern rental apartments and 2 flexible commercial premises, suitable for singles, couples and families as well as offices, practices and studios. Construction began with the official groundbreaking ceremony on 28 September 2026. Completion is planned for summer/autumn 2028.