
Casa Aurum
Disentis/Mustér, Graubünden
The project
Casa Aurum offers 12 exclusive alpine apartments in the historic centre of Disentis/Mustér in the Grisons, at an altitude of 1450 m. The modern architecture combines local stone, warm wood and brushed brass accents. Each residence offers panoramic views of the mountains and the Benedictine monastery.
Automatic translation of the original French description.
Details
- Town
- Disentis/Mustér
- Canton
- Graubünden
Information from the developer, collected on 30 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Disentis/Mustér
Not the right one? Get an e-mail when a new development reaches the market in Disentis/Mustér.
Other projects in the canton of Graubünden
All projects in Graubünden →
For saleGRKüblis, Salums
Küblis, Graubünden
3 homes
SALUMS is a building with three owner-occupied 3.5-room apartments, located on the sunny south-facing slope, slightly elevated above the village centre of Küblis. The apartments, of approximately 89 to 91 m², offer a modern standard of finish and are heated by an air-to-water heat pump with a photovoltaic system. They are intended as primary residences; the attic apartment has already been sold.
For saleGRGUTVEINA
Flims, Graubünden
11 homes
In Flims, the GUTVEINA project comprises two buildings with eleven owner-occupied apartments, combining contemporary architecture with the traditional building culture of the Grisons and well integrated into the sloping terrain. It offers six 4.5-room apartments as primary residences and five 1- and 2.5-room apartments as secondary residences. Flims Laax railway station is directly accessible and step-free.
For saleGRSägereistrasse
Malans, Graubünden
Online since June 2026 · checked 9 days ago
10 homes · CHF 1’245’000 – CHF 1’415’000
Within the perimeter of Sägereistrasse in Malans (GR), 10 spacious owner-occupied apartments with covered outdoor areas are being built. The building comprises three full storeys and an attic level, with an underground car park, parquet flooring, equipped open-plan kitchens, a heat pump and a photovoltaic system. Construction began in autumn 2026, and the first apartments will be habitable in spring 2028.