
Unterfeld Süd
Baar, Zug
The project
The Unterfeld Süd district in Baar will comprise around 400 homes and some 30'000 m2 of office, commercial and retail space, built in three stages across five building plots. The first stage, with a residential tower and a commercial building near Lindenpark station, started in September 2026. The district is developed to the SNBS sustainable construction standard, with homes given priority to residents of Baar.
Automatic translation of the original French description.
Images
Details
- Town
- Baar
- Canton
- Zug
Information from the developer, collected on 23 novembre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Baar
Not the right one? Get an e-mail in the morning when a new development reaches the market in Baar.
Other projects in the canton of Zug
All projects in Zug →
For saleZGIm Himmelrich
Baar, Zug
checked yesterday
6 homes
Building with six owner-occupied 3.5-room apartments on a quiet hillside in the popular Himmelrich district of Baar. The floor plans are efficient, the materials high quality and the apartments bright, with balconies. A modern lift serves the underground car park.
For saleZGTHE RIDGE
Hünenberg See, Zug
checked yesterday
2 villas · from CHF 6’750’000
The Ridge is a development of two high-end houses in Hünenberg See, in the canton of Zug, near Lake Zug. Each residence offers 356 m² of living space on a 500 m² plot, with 4 bedrooms, 3 bathrooms, terraces, a garage for two vehicles and an attic with roof terrace. Options such as a swimming pool, outdoor kitchen, sauna and jacuzzi are available.
To be confirmedZGWohnüberbauung Gutsch
Allenwinden, Zug
New residential development of detached and semi-detached houses with underground garages, located in Allenwinden. Construction work is planned from 2027. The project is developed and built as a general contract by C. Vanoli.