
Park 3
Frenkendorf, Basel-Landschaft
The project
Park 3 is a residential building located at Parkstrasse 3 in Frenkendorf, offering 22 rental apartments of 2.5 and 3.5 rooms. The apartments, ranging from 52 to 89 m², are spread from the 1st floor up to the attic. Commercial spaces complete the offer.
Automatic translation of the original French description.
Images
Details
- Town
- Frenkendorf
- Canton
- Basel-Landschaft
- Address
- Parkstrasse 3
- Unit types
- 2.5 pièces, 3.5 pièces
Information from the developer, collected on 27 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodologyAre you the developer? Correct or remove this listing
The next projects in Frenkendorf
Not the right one? Get an e-mail when a new development reaches the market in Frenkendorf.
Other projects in the canton of Basel-Landschaft
All projects in Basel-Landschaft →
Registration openBLWohnpark Fichtenrain
Therwil, Basel-Landschaft
checked today
31 homes
Le Wohnpark Fichtenrain comprend 31 appartements locatifs de 2½ à 5½ pièces répartis dans quatre immeubles, sur les hauteurs de Therwil, à 20 minutes de Bâle. Entourés d'arbres existants, les logements disposent chacun d'un balcon ou d'une terrasse, de finitions de qualité et d'un garage souterrain. Les travaux sont en cours et l'emménagement est prévu dès juin 2027.
For saleNewBLAm Weieracker
Thürnen, Basel-Landschaft
Online since September 2026 · checked 3 days ago
15 villas · CHF 1’130’000 – CHF 1’697’000
Am Weieracker offers 14 semi-detached houses and one detached villa of 5.5 to 6.5 rooms, each with its own outdoor space, on the quiet edge of the village of Thürnen (BL), 25 minutes from Basel. Prices include the double garage or double carport, and each house is equipped with an air-to-water heat pump and underfloor heating. Occupancy is staggered from the first quarter of 2028.
Coming soonBLZentrum Süd
Reinach (BL), Basel-Landschaft
New construction project in Reinach (BL), for which land purchase contracts were concluded in 2025. The development plan procedure is ongoing and the start date of the works has not yet been set.