Demande d’autorisation de construireUnder review
Air-to-Water Heat Pump in Pont-en-Ogoz FR
Avry-devant-Pont, Les Planchettes 25, Pont-en-Ogoz
Get new building permits filed in Pont-en-Ogoz by e-mail
For professionalspro
The project plans to replace an oil-fired boiler with an outdoor air-to-water heat pump for a single-family house. For professionals, this means a small-scale heating job involving hydraulic and electrical connections; the application has been submitted but not yet approved.
Trades involved
Heating and ventilationElectricalPlumbing
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Replacement of the oil-fired boiler with an externally installed air-water heat pump.
Automatic translation of the official notice published in French.
Progress
Filed on 20 November 2026 · status as of 20 November 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Main Residence Converted to Secondary Residence in Pont-en-Ogoz FRPont-en-Ogoz · FR · 20.11.2026
Change of Agricultural Use in Pont-en-Ogoz FRPont-en-Ogoz · FR · 20.11.2026
House Transformation in Pont-en-Ogoz FRPont-en-Ogoz · FR · 13.11.2026
Attic Converted into Office in Pont-en-Ogoz FRPont-en-Ogoz · FR · 23.10.2026
Geothermal Heat Pump Replacement in Pont-en-Ogoz FRPont-en-Ogoz · FR · 02.10.2026
Geothermal Heat Pump Replaced by Air-to-Water Heat Pump in Pont-en-Ogoz FRPont-en-Ogoz · FR · 02.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.