Demolition and Reconstruction of a Villa in Villars-sur-Glâne FR
Chemin de la Combert 8, Villars-sur-Glâne
Get new building permits filed in Villars-sur-Glâne by e-mail
For professionalspro
Demolition of the existing villa and construction of a detached single-family house on two levels in timber frame, built on the retained basement, with a visitor parking space and a geothermal probe. The file, in a supplementary review with exemption requests and the felling of two protected trees, mainly concerns structural work, carpentry, earthworks and outdoor landscaping; it is a submitted application, not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Demolition and construction of a detached villa, supplementary public inquiry: derogation from the distance to the road and amended plans. Only the modifications made to the project may be subject to an objection. Requests for derogation: to the municipal road, the existing basement of the house is retained as the base for the construction of 2 levels in timber frame. The basement is located 495 cm from the property boundary. The projected façades protrude about 22 cm beyond the basement. The new façades will therefore be 473 cm from the property boundary, respectively from the road. A longitudinal visitor parking space is projected 100 cm from the property boundary in relation to the road. This space is bordered by a non-trafficable green strip. A geothermal probe is located 420 cm from the property boundary in relation to the road. This position is directly linked to the technical room in the basement. Regarding protective measures for wooded areas outside the forest (trees, hedges, groves): request to fell 2 protected trees. A cherry tree, trunk circumference = 145 cm. The tree no longer produces fruit and shows signs of disease; it is compensated by planting a maple. A ginkgo, trunk circumference = 146 cm. The tree is located too close to the building and the boundary, preventing construction and the passage of pipes; it is compensated by planting a mixed-species living hedge. These compensations were discussed with the municipality on 12 November 2025
Automatic translation of the official notice published in French.
Progress
Filed on 20 November 2026 · status as of 20 November 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Heat Pump Replacing Oil Heating in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 13.11.2026
Compliance Upgrade of a Change of Use in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 06.11.2026
Redesign of Entrance Vestibule in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 30.10.2026
District Heating Connection in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 30.10.2026
Geothermal Heat Pump in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 23.10.2026
Conversion of Detached House in Villars-sur-Glâne FRVillars-sur-Glâne · FR · 23.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.