Transformation d'une maison avec pompe à chaleur à Fully VS
La Fontaine, Fully
Get new building permits filed in Fully by e-mail
For professionalspro
Transformation and extension of an existing house in Fully, replacing the oil boiler with an outdoor air-to-water heat pump and building a covered carport that requires an exemption from the minimum distance between buildings. For professionals, this is a major renovation involving structural, heating and carpentry work; the building permit application has been submitted but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Transformation and extension of an existing building with installation of an outdoor air-to-water heat pump replacing an oil boiler and construction of a car shelter in deviation from Art. 80 RCC (distance between buildings)
Automatic translation of the official notice published in French.
Progress
Filed on 20 November 2026 · status as of 20 November 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Deux villas jumelées à Fully VSFully · VS · 20.11.2026
Apartment Building with 5 Units in Fully VSFully · VS · 13.11.2026
Residential Building in Fully VSFully · VS · 06.11.2026
Apartment Building with 10 Units in Fully VSFully · VS · 06.11.2026
Energy Retrofit of a Building in Fully VSFully · VS · 16.10.2026
Heat Pump Replacing Oil Heating in Fully VSFully · VS · 09.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.