BaugesuchUnder review
Heat Pump Replacing Gas in Kirchberg BE
Kirchberg (BE)
For professionalspro
The project plans to replace the existing gas heating of this building with an outdoor-mounted air-to-water heat pump. For professionals, this means heating, electrical and outdoor installation work of limited scale for a residential building; the application has been submitted but not yet approved.
Trades involved
Heating and ventilationElectricalLandscapingCivil engineering
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Replacement of the existing gas heating system with an outdoor-installed air-to-water heat pump
Automatic translation of the official notice published in French.
Progress
Filed on 12 October 2026 · status as of 12 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
- Attic Conversion and Dormer Window in Kirchberg BEKirchberg (BE) · BE · 12.10.2026
- Heat Pump Replacing Gas in Kirchberg BEKirchberg (BE) · BE · 01.10.2026
- Bocce Court Roof in Kirchberg BEKirchberg (BE) · BE · 01.10.2026
New Residential Building in Lyssach BELyssach · BE · 02.10.2026- Self-Storage on the 3rd Floor in Lyssach BELyssach · BE · 28.09.2026
- Wood Chip Storage Extension in Rüegsau BERüegsau · BE · 30.09.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.