Oil Boiler Replacement with Heat Pump in Bulle FR
Impasse du Ruisseau 10, Bulle
Get new building permits filed in Bulle by e-mail
For professionalspro
The project plans to replace an oil-fired boiler with an outdoor air-to-water heat pump. For professionals, this means heating work (removing the oil system, installing the outdoor unit, hydraulic and electrical connections) on a limited scope, covering a single heating system; the application has been submitted and is not yet authorised.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Replacement of the oil boiler with an outdoor air-water heat pump (HP).
Automatic translation of the official notice published in French.
Progress
Filed on 9 October 2026 · status as of 9 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Multi-Family Building with Parking in Bulle FRBulle · FR · 20.11.2026
Heating Replacement with Geothermal Heat Pump in Bulle FRBulle · FR · 20.11.2026
Three Villas with 3 Apartments Each in Bulle FRBulle · FR · 20.11.2026
Connection to District Heating in Bulle FRBulle · FR · 13.11.2026
Rental Building With 10 Apartments in Bulle FRBulle · FR · 13.11.2026
Conversion of a Ground Floor Into a Studio in Bulle FRBulle · FR · 13.11.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.