BaugesuchUnder review
Change of Use of an Alpine Hut in Ried-Brig VS
Mäderalpa, Ried-Brig
For professionalspro
The project is a change of use for an existing alpine herders' hut in Ried-Brig (VS), whose size is not specified in the file. For professionals, this may involve conversion work on an existing building, with the scope still to be determined; the application has been filed and is not yet approved.
Trades involved
Civil engineeringJoineryElectricalPlumbingInsulation
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Umnutzungsbewilligung Alp- und Hirtenhütte
Progress
Filed on 2 October 2026 · status as of 2 October 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Die Schweizerische Eidgenossenschaft, Eidg. Departement für Verteidigung, Bevölkerungsschutz und Sport (VBS) vertreten durch armasuisse Immo… Show all
Die Schweizerische Eidgenossenschaft, Eidg. Departement für Verteidigung, Bevölkerungsschutz und Sport (VBS) vertreten durch armasuisse ImmobilienOther projects nearby
- Conversion and Extension in Termen VSTermen · VS · 09.10.2026
Former Shop Converted into Event Hall in Naters VSNaters · VS · 02.10.2026
Barn Converted into Workshop in Brig-Glis VSBrig-Glis · VS · 02.10.2026- Wooden Shelter at the Fire Station in Naters VSNaters · VS · 09.10.2026
Impuls Cube Commercial Building in Brig-Glis VSBrig-Glis · VS · 09.10.2026- Drinking Water Pipe Replacement in Lalden VSLalden · VS · 02.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.