Residential Building in Bardonnex GE
253, Route d'Annecy, Bardonnex
For professionalspro
A residential building with workshops and multi-purpose rooms is planned in Bardonnex, along with the renovation of existing buildings and the creation of a public park. For professionals, this means construction, renovation and outdoor works; the application has been submitted and is not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction d'un immeuble de logement et d'ateliers/salles polyvalentes, rénovation et transformation de bâtiments existants et aménagement d'un parc public, abattage et/ou élagage d'arbres hors forêt (RCVA), installation de panneaux solaires et de PAC
Progress
Filed on 7 May 2026 · status as of 26 May 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Fondation de la Commune de Bardonnex pour le Logement (FCBL)
Mme Béatrice Guex-Crosier c/o Mairie de Bardonnex Route de Cugny , 99 CH-1257 Croix de Rozon
Fondation de la Commune de Bardonnex pour le Logement (FCBL)
M Luc Lavarini c/o Mairie de Bardonnex Route de Cugny, 99 CH-1257 La Croix-de-Rozon
Fondation de la Commune de Bardonnex pour le Logement (FCBL)
Mme Béatrice Guex-Crosier c/o Mairie de Bardonnex Route de Cugny , 99 CH-1257 Croix de Rozon;Fondation de la Commune de Bardonnex pour le Logement (FCBL) M Luc Lavarini c/o Mairie de Bardonnex Route de Cugny, 99 CH-1257 La Croix-de-Rozon
Other projects nearby
Cluster Housing in Bardonnex GEBardonnex · GE · 25.08.2026
Residential Building in Bardonnex GEBardonnex · GE · 17.08.2026- Cluster Housing in Troinex GETroinex · GE · 22.09.2026
Two Buildings in Plan-les-Ouates GEPlan-les-Ouates · GE · 03.07.2026
Construction d'habitats groupés (30% THPE) et d'un garage souterrain , Abattage et/ou élagage d'arbres hors forêt (RCVA)Plan-les-Ouates · GE · 01.09.2025
Grouped Housing in Troinex GETroinex · GE · 23.12.2025
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.