Residential Building in Pully VD
Ch. des Anciens Moulins 28, Pully
Get new building permits filed in Pully by e-mail
For professionalspro
A residential building of 3 floors, with an attic and a basement, is planned in Pully to replace two existing buildings that would be demolished. For professionals, this means a full demolition and construction project (structural work, technical installations, 4 parking spaces and 1 visitor space); the application has been submitted but is not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Demolition of buildings 2812 and 2850 and construction of an apartment building over 3 storeys, attic and basement with 4 parking spaces and 1 visitor parking space.
Automatic translation of the official notice published in French.
Progress
Filed on 17 February 2026 · status as of 17 February 2026
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
4-Unit Residential Building in Pully VDPully · VD · 24.11.2026
Temporary Nursing Home at Aux Quatre Vents in Pully VDPully · VD · 20.11.2026
Two Residential Buildings After Demolition in Pully VDPully · VD · 17.11.2026
Demolition and Reconstruction of a Residential Building in Pully VDPully · VD · 13.11.2026
Geothermal Heat Pump Replaced by Air-to-Water Heat Pump in Pully VDPully · VD · 10.11.2026
Attic Conversion into Apartment in Pully VDPully · VD · 27.10.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.