Construction d’un habitat groupé (44% THPE), d'un parking souterrain et installation de capteurs photovoltaïques en façade, abattage et/ou élagage d'arbres…
2, Chemin Edouard-TAVAN, Genève-Plainpalais
For professionalspro
The project involves building a group of homes with high energy performance (44% THPE), an underground car park, photovoltaic panels on the façade, and felling or pruning of trees, along with a change to the layout, one additional dwelling and a sauna in the basement. For professionals, this means substantial work on structure, excavation, electrical systems and façades; the application has been filed but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction d’un habitat groupé (44% THPE), d'un parking souterrain et installation de capteurs photovoltaïques en façade, abattage et/ou élagage d'arbres hors forêt (RCVA) - modification typologique, aménagement d'un logement supplémentaire et installation d’un sauna au sous-sol
Progress
Filed on 7 November 2025 · status as of 25 November 2025
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Residential Building in Genève-Plainpalais GEGenève-Plainpalais · GE · 29.09.2026
Residential Buildings in Geneva-Plainpalais GEGenève-Plainpalais · GE · 21.08.2026
Two Residential Buildings in Genève-Plainpalais GEGenève-Plainpalais · GE · 07.04.2026
3 Buildings with Shops in Genève-Plainpalais GEGenève-Plainpalais · GE · 26.03.2026
Residential Complex in Geneva-Plainpalais GEGenève-Plainpalais · GE · 18.03.2026
Mixed-Use Residential Building in Genève GEGenève-Plainpalais · GE · 15.12.2025
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.