((Construction d'un habitat groupé de 7 logements - THPE 30% - couvert à vélos - rampe d'accès - panneaux photovoltaïques/thermiques - PAC sol/eau - sondes…
10, Chemin de Malvand, Pregny-Chambésy
For professionalspro
The project is a group housing development of 7 apartments in Pregny-Chambésy, with solar panels, a heat pump and geothermal probes, plus changes to the car park, an access ramp and a bicycle shelter. It also includes tree felling, extended roof terraces on the top floor and replacing green roofs with gravel roofs. For professionals, this involves structural work, earthworks, building services and roofing; the application has been submitted but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
((Construction d'un habitat groupé de 7 logements - THPE 30% - couvert à vélos - rampe d'accès - panneaux photovoltaïques/thermiques - PAC sol/eau - sondes géothermiques - Abattage d'arbres) - Adaptation du parking aux normes VSS, avec modification du gabarit et ajustement des niveaux) - Prolongation des terrasses de l'attique, suppression de la casquette en attique et remplacement des toitures végétalisées par des toitures en gravier
Progress
Filed on 10 September 2025 · status as of 19 September 2025
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Grouped Housing in Pregny-Chambésy GEPregny-Chambésy · GE · 31.07.2026
Semi-detached Villas in Pregny-Chambésy GEPregny-Chambésy · GE · 31.07.2026
Semi-Detached Villas in Pregny-Chambésy GEPregny-Chambésy · GE · 19.05.2026
THPE Grouped Housing in Pregny-Chambésy GEPregny-Chambésy · GE · 20.04.2026
Three Contiguous Villas in Pregny-Chambésy GEPregny-Chambésy · GE · 20.03.2026
Four Contiguous Villas in Pregny-Chambésy GEPregny-Chambésy · GE · 10.03.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.