Construction d'un habitat groupé THPE (48%) - installation de pompes à chaleur et de panneaux solaires - abattage d'arbres, modification du taux à 40% pour les…
10, Chemin des Sellières, Vernier
For professionalspro
A group housing project with very high energy performance, at a rate of 48%, is planned in Vernier, with heat pumps and solar panels, along with tree felling and a change of rate to 40% for two existing houses. For trade professionals, this mainly involves structural work, earthworks, heating and solar installation, with the scale still to be confirmed; the application has been filed but not yet approved.
Trades involved
Summary written by NovaNest’s AI from the official notice; check the details in the file.
The project
Construction d'un habitat groupé THPE (48%) - installation de pompes à chaleur et de panneaux solaires - abattage d'arbres, modification du taux à 40% pour les maisons existantes Nos B2057 et B2058
Progress
Filed on 17 September 2025 · status as of 30 September 2025
- 1Filed
- 2Review
- 3Final review
- 4Decision
- 5Construction
- 6Closed
People involved
Other projects nearby
Grouped Housing in Vernier GEVernier · GE · 29.09.2026
Residential Building in Vernier GEVernier · GE · 27.08.2026
Residential Buildings in Vernier GEVernier · GE · 09.07.2026
Contiguous Villas in Vernier GEVernier · GE · 09.07.2026
Collective Accommodation in Vernier GEVernier · GE · 05.06.2026
Residential Building in Vernier GEVernier · GE · 01.06.2026
Information from the official public-inquiry notices. It may be incomplete; the official file prevails.