
Villa il Nido
Lodrino, Ticino
The project
Villa il Nido is a project of two mirror-image detached twin villas, Il Nido 1 and Il Nido 2, located on a private road in Lodrino, in the Riviera valley. Each villa is fully independent, with exclusive access, large panoramic windows and a private garden. The quiet, well-connected residential area is suitable for families.
Automatic translation of the original French description.
Images
Details
- Town
- Lodrino
- Canton
- Ticino
- Address
- Via Pasquerio, Lodrino
- Unit types
- villas individuelles jumelles en miroir
- Broker
- Explotecnica Project Management SA
- Contact
- villailnido@explotecnica.ch
- Phone
- 091 941 58 31
Information from the developer, collected on 06 octobre 2026. It may be incomplete or have changed since. Check with the developer before any decision. Our methodology
Other projects in the canton of Ticino
All projects in Ticino →
Coming soonNewTICasa Ennaya
Caslano, Ticino
Online since September 2026 · checked today
10 homes
Casa Ennaya is a community housing project in Caslano (Ticino), backed by a non-profit foundation, offering 10 to 14 housing units along with shared spaces such as a kitchen, dining room, library, living room, multipurpose room and workshop, with a large garden and a swimming pool. The project is still at the development stage, with the concept and idea developed and clarifications regarding the building under way.
To be confirmedNewTICasa YOKU
Ascona, Ticino
Online since July 2026 · checked 5 days ago
Casa YOKU is a residential project located in Ascona. The website offers an interactive presentation of the project, with floor plans, a price list in PDF and contact details.
For saleTIResidenza Barico
Stabio, Ticino
Online since April 2026 · checked 8 days ago
27 homes · CHF 525’000 – CHF 1’050’000
Residenza Barico is a new residential development located in the quiet and sunny Barico district, in the municipality of Stabio (Ticino). Three modern residential buildings house a total of 27 condominium apartments of 1.5 to 4.5 rooms, with large balconies and terraces. Handover is scheduled for autumn/winter 2027.